{"id":3419,"date":"2020-04-29T11:21:45","date_gmt":"2020-04-29T11:21:45","guid":{"rendered":"http:\/\/hornsey-town-hall.org.uk\/?p=3419"},"modified":"2020-04-29T11:21:45","modified_gmt":"2020-04-29T11:21:45","slug":"work-resumes-at-hornsey-town-hall","status":"publish","type":"post","link":"https:\/\/hornsey-town-hall.org.uk\/index.php\/2020\/04\/29\/work-resumes-at-hornsey-town-hall\/","title":{"rendered":"Work resumes at Hornsey Town Hall"},"content":{"rendered":"<p>We&#8217;ve been advised that building work has resumed at Hornsey Town Hall as of Monday 27th April.\u00a0 Ardmore took the decision on 23rd March to suspend construction operations across all its projects including Hornsey Town Hall, for reasons of health, safety and wellbeing of its staff and the wider public.<\/p>\n<p>They say that &#8220;the Government has confirmed that construction sites should return to work if they are able to safely comply with the Construction Leadership Council\u2019s Site Operating Procedures. These procedures, which reflect Public Health England guidance, provide sector-specific guidance for construction sites to operate whilst protecting the workforce and the public, and minimising the risk of spread of infection.<\/p>\n<p>&#8220;Ardmore has undertaken a review of its current work practices to understand if and how each site could operate in line with these Standard Operating Procedures, as well as reviewing how people can safely travel to and from work and whether additional protection strategies above and beyond the guidelines can be brought in.\u00a0With this in mind, a managed return to work began at Hornsey Town Hall from Monday 27th\u00a0April, initially with a limited team in place.<\/p>\n<p>The construction team at Hornsey Town Hall remains directly contactable for any urgent enquiries during this time on:\u00a00208 344 0300.&#8221;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We&#8217;ve been advised that building work has resumed at Hornsey Town Hall as of Monday 27th April.\u00a0 Ardmore took the decision on 23rd March to suspend construction operations across all its projects including Hornsey Town Hall, for reasons of health, safety and wellbeing of its staff and the wider public. They say that &#8220;the Government [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[1],"tags":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6JaYr-T9","jetpack-related-posts":[{"id":4257,"url":"https:\/\/hornsey-town-hall.org.uk\/index.php\/2020\/11\/24\/hornsey-town-hall-autumn-newsletter\/","url_meta":{"origin":3419,"position":0},"title":"Hornsey Town Hall Autumn newsletter","date":"November 24, 2020","format":false,"excerpt":"The Autumn 2020 newsletter from the project team at Hornsey Town Hall - FEC (the developers), Ardmore Construction and Newington Communications - has just been make published.\u00a0 A construction update is included and brief information about the works going on to restore the Town Hall Square. You can read more\u2026","rel":"","context":"Similar post","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":3724,"url":"https:\/\/hornsey-town-hall.org.uk\/index.php\/2020\/06\/16\/latest-construction-steering-group-update\/","url_meta":{"origin":3419,"position":1},"title":"Latest Construction Steering Group update","date":"June 16, 2020","format":false,"excerpt":"Meetings of the Hornsey Town Hall Construction Steering Group have resumed, albeit on Zoom. A well-attended meeting, including local residents, ward councillors and representatives from LBH's planning department, FEC (the developer), Make Architects, Crouch End Area Assembly,\u00a0 Crouch End Festival, and HTHT, was held on 2 June.\u00a0 \u00a0The minutes are\u2026","rel":"","context":"Similar post","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4265,"url":"https:\/\/hornsey-town-hall.org.uk\/index.php\/2020\/11\/26\/construction-work-at-hth-this-weekend\/","url_meta":{"origin":3419,"position":2},"title":"Construction work at HTH this weekend","date":"November 26, 2020","format":false,"excerpt":"Ardmore, the contractors at Hornsey Town Hall, have asked us to circulate this notice of works (including sheet piling) at the rear of the library.\u00a0 It will be phased over two days - Friday 27th November and Saturday 28th November. Their information notice is here:\u00a0Ardmore_notification_of_Saturday_HTH_works","rel":"","context":"Similar post","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":1745,"url":"https:\/\/hornsey-town-hall.org.uk\/index.php\/2019\/06\/01\/fec-appoints-contractor-for-hornsey-town-hall\/","url_meta":{"origin":3419,"position":3},"title":"FEC appoints contractor for Hornsey Town Hall","date":"June 1, 2019","format":false,"excerpt":"In its first newsletter (they will be quarterly) FEC has announced that it has appointed Ardmore Construction\u00a0http:\/\/www.ardmoregroup.co.uk as the contractor for both the restoration and refurbishment of Hornsey Town Hall and the residential development to its rear. We're pleased to see that Ardmore has previously worked on a number of\u2026","rel":"","context":"Similar post","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4722,"url":"https:\/\/hornsey-town-hall.org.uk\/index.php\/2021\/12\/05\/town-hall-square-update\/","url_meta":{"origin":3419,"position":4},"title":"Town Hall Square update","date":"December 5, 2021","format":false,"excerpt":"We're delighted to see that Haringey Council stepped in swiftly to issue a Breach of Condition Notice to ensure that the Town Hall Square will be paved with York Stone, as consented by planning, and not in granite. Both the Trust and Crouch End Neighbourhood Forum contacted the council to\u2026","rel":"","context":"Similar post","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4487,"url":"https:\/\/hornsey-town-hall.org.uk\/index.php\/2021\/02\/24\/november-2020-construction-steering-group-minutes\/","url_meta":{"origin":3419,"position":5},"title":"November 2020 Construction Steering Group minutes","date":"February 24, 2021","format":false,"excerpt":"Here are the draft minutes from November's construction steering group meeting.\u00a0 Lots of questions and comments about noise on the site and the need for a quick response from the construction team.\u00a0 And progress on the Town Hall Square. 201125_Hornsey_Town_Hall_CSG-Meeting_Minutes_DRAFT The first meeting of 2021 is tomorrow night, Thursday 25th\u2026","rel":"","context":"Similar post","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/hornsey-town-hall.org.uk\/index.php\/wp-json\/wp\/v2\/posts\/3419"}],"collection":[{"href":"https:\/\/hornsey-town-hall.org.uk\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hornsey-town-hall.org.uk\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hornsey-town-hall.org.uk\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/hornsey-town-hall.org.uk\/index.php\/wp-json\/wp\/v2\/comments?post=3419"}],"version-history":[{"count":1,"href":"https:\/\/hornsey-town-hall.org.uk\/index.php\/wp-json\/wp\/v2\/posts\/3419\/revisions"}],"predecessor-version":[{"id":3420,"href":"https:\/\/hornsey-town-hall.org.uk\/index.php\/wp-json\/wp\/v2\/posts\/3419\/revisions\/3420"}],"wp:attachment":[{"href":"https:\/\/hornsey-town-hall.org.uk\/index.php\/wp-json\/wp\/v2\/media?parent=3419"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hornsey-town-hall.org.uk\/index.php\/wp-json\/wp\/v2\/categories?post=3419"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hornsey-town-hall.org.uk\/index.php\/wp-json\/wp\/v2\/tags?post=3419"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}